IPMS

IPMS: Integrated Project Management System

IPMS connects the estimate, schedule, timesheets and control reports in one model, so every report starts from the same numbers.

Why we built it

One model instead of a pile of spreadsheets

On most projects the estimate, schedule, cost reports and timesheets live in separate spreadsheets and tools, and the team spends time reconciling them instead of managing the project.

IPMS replaces that with one model. It grew out of the Excel-based IPMS that CPCMS developed for its own work, and the web version adds multi-user access, roles and approvals.

Availability. IPMS is provided to CPCMS clients as part of our services. It is not open for public sign-up. Ask us for a demonstration.
How it works

Set up once, control every period

  1. 01Set upPlant type, throughput, scope, location, estimate class and levels of detail.
  2. 02EstimateItem-level estimate, CBS roll-up and EPCM estimate to deliverable level.
  3. 03BaselineBudget and schedule baselined, from level 1 to level 5.
  4. 04ControlTimesheets, progress and changes feed man-hour, cost and budget control.
  5. 05Report12 reports, P6 and MS Project exports, plans and procedures.
What’s inside

Every part of project controls, connected

Projects and set-up

22 plant types, throughput, underground mining, scope, country and location factor, estimate class, start date and schedule level.

Item-level estimate

More than 7 400 library lines with norms-based quantities, overrides, MTO import, a package register and a tagged equipment list.

Cost breakdown structure

A roll-up of the estimate from level 1 to level 6 that always reconciles.

EPCM estimate

Every discipline and service to deliverable level, with level-of-effort balance, rates, expenses, histograms and a benchmark check.

Control

Man-hour, EPCM cost and budget control with PV, EV, AC, ETC, EAC, CPI and SPI, a change register and contingency drawdown.

Timesheets

Book to baseline lines, submit and approve. Approval posts the actual, and closed weeks are locked.

Schedule

Views from level 1 to level 5, with Primavera P6 (XER) and Microsoft Project (XML) export.

Reports

12 standard reports in Excel and PDF, from the estimate summary to man-hour control.

Plans and procedures

BOE, BOS, PEP and management plans, plus eight procedures, written from the live project.

Security and integrity

Built to stand up to an audit

  • Named users with system and project roles, from administrator to viewer
  • Approvals cannot change booked hours, and closed weeks and periods are locked
  • An append-only audit log of sign-ins and changes
  • Access rules enforced on the server, not only in the browser
Works with your tools

Exports your team already uses

Primavera P6 (XER)Microsoft Project (XML)ExcelPDFWord