Project controls services

From feasibility to close-out, we provide the methods, people and system to keep capital projects under control.

Cost estimating

We build estimates from the item level up, using library norms and quantities adjusted for location and estimate class, and document them in a Basis of Estimate. EPCM services are estimated to deliverable level, so the budget for engineering and management is as traceable as the budget for steel and concrete.

What you get

  • Basis of Estimate (BOE)
  • Item-level estimate with norms-based quantities, overrides and MTO import
  • Package register, equipment and item list with tags
  • EPCM estimate: engineering MDR per package, procurement, construction management, commissioning, PM, controls, quality, HSE and document control
  • Benchmark check and baseline

Planning and scheduling

We prepare schedules at the level of detail each audience needs, from a level 1 summary for the board to level 5 for the work face, and record the logic and assumptions in a Basis of Schedule.

What you get

  • Basis of Schedule (BOS)
  • Schedules from level 1 to level 5
  • Export to Primavera P6 (XER) and Microsoft Project (XML)
  • Regular schedule updates linked to measured progress

Cost and budget control

We roll the estimate up into a cost breakdown structure that always reconciles, then control it period by period: budget, changes, forecasts and contingency.

What you get

  • CBS from level 1 to level 6, reconciled to the estimate
  • Budget and EPCM cost control
  • Change register and contingency drawdown
  • Period close with locked history

Man-hour control and timesheets

EPCM time is booked against baseline lines, approved by the responsible lead and posted as actuals in the same step, so man-hour reports are always current.

What you get

  • Timesheets booked to the baseline
  • Submit and approve workflow
  • Man-hour control reports and histograms
  • Closed weeks locked against changes

Progress measurement and earned value

Progress is measured by agreed rules of credit and turned into earned value, so performance is objective and comparable from one period to the next.

What you get

  • Rules of credit by deliverable type
  • PV, EV, AC, ETC and EAC
  • CPI and SPI with trends
  • S-curves for the project and each package

Risk management

We run the risk process from the register to quantitative analysis, so contingency is set on evidence rather than a percentage.

What you get

  • Risk Management Plan and procedure
  • Risk register with owners and mitigation actions
  • Quantitative cost and schedule risk analysis (P50, P80, P90)
  • Contingency setting and drawdown

Plans and procedures

We prepare the management plans and procedures that define how the project will be controlled, written from the project’s own data rather than generic templates.

What you get

  • Project Execution Plan (PEP)
  • Project Controls, Cost, Document and Risk Management Plans
  • Basis of Estimate and Basis of Schedule
  • Eight procedures: estimating, cost control and reporting, change management, planning and scheduling, progress and earned value, timesheets and man-hours, document control, and risk

Reporting

Standard reports give owners, lenders and project teams the same view of the project, every period.

What you get

  • 12 standard reports in Excel and PDF
  • Estimate summary and detail, CBS and EPCM estimate
  • Cost, budget and man-hour control
  • Schedule, MDR, equipment list, package register and timesheets
How we work

A clear path from set-up to reporting

  1. Understand

    We learn the scope, project stage, contracting strategy and reporting needs.

  2. Set up

    We build the structures, estimate and baseline in IPMS.

  3. Control

    We run the weekly and monthly control cycle with your team.

  4. Report

    We report performance and forecasts, and flag issues early.